{"id":3211,"date":"2025-10-16T11:38:08","date_gmt":"2025-10-16T09:38:08","guid":{"rendered":"https:\/\/www.meccanostampi.it\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/"},"modified":"2025-10-21T13:02:43","modified_gmt":"2025-10-21T11:02:43","slug":"from-floor-to-press-multi-project-management-that-keeps-its-promises","status":"publish","type":"post","link":"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/","title":{"rendered":"From floor to press: multi-project management that keeps its promises"},"content":{"rendered":"\n<p>At Meccanostampi, scheduling is not an ancillary activity: it is the engine that aligns people, equipment and priorities to meet the <strong>delivery date required by the customer<\/strong>. That is why we have structured the scheduling of our two BUs, <strong>&#8220;Moldmaking<\/strong> &#8221; and <strong>&#8220;Molding<\/strong>,&#8221; in an integrated way. <\/p>\n\n<p>Today we operate with a <strong>multi-project management platform<\/strong> for tooling (design, construction, mold testing, and sample control) and an <strong>advanced planning and scheduling system (APS)<\/strong> for molding departments. The goal is one: <strong>optimize all resources<\/strong>, technical, human, and plant, and give customers <strong>reliability on dates<\/strong>. <\/p>\n\n<h2 class=\"wp-block-heading\"><strong>From manual coordination to finite capacity scheduling<\/strong><\/h2>\n\n<p>Until recently, progress monitoring in mold making was done <strong>manually<\/strong>, with periodic reviews together with department managers and <strong>experience-based estimates<\/strong> to predict deliveries. This approach, while based on great expertise, limited visibility into a portfolio of parallel job orders. <\/p>\n\n<p>With the introduction of <strong>finite-capacity multi-project management<\/strong>, every task, from design to testing to sampling, is planned considering <strong>actual loads<\/strong> and <strong>resource availability<\/strong>. In practice, the system <strong>distributes work<\/strong> across production assets in an <strong>optimized<\/strong> manner, respecting <strong>priorities<\/strong> and <strong>delivery constraints<\/strong>. <\/p>\n\n<p>In parallel,<strong>integration with business systems<\/strong> ensures <strong>unity of data<\/strong> (plans, actuals, KPIs) and allows the effect of a change on the entire order book to be read <strong>in real time.<\/strong> Result: <strong>less uncertainty, more control, quick decisions<\/strong>. <\/p>\n\n<h2 class=\"wp-block-heading\"><strong>End-to-end control of the mold order<\/strong><\/h2>\n\n<p><strong>What, specifically, changes for the BU &#8220;Mould Construction&#8221;?<\/strong><\/p>\n\n<p><strong>Real-time progress.<\/strong> Each phase-design, construction, testing, sampling-is <strong>consuntivated<\/strong> directly on planned activities. The data is no longer &#8220;a posteriori&#8221;: it is <strong>native<\/strong>, <strong>traceable<\/strong> and comparable with the <strong>estimate<\/strong>. <\/p>\n\n<p><strong>Reliability on deliverables.<\/strong> Date adherence is <strong>monitored continuously<\/strong>: the system highlights <strong>deviations<\/strong> between budget and actual and supports <strong>dynamic rescheduling<\/strong> when constraints or priorities change.<\/p>\n\n<p><strong>Simulated forecasts, not just estimated.<\/strong> <strong>Delivery forecasts<\/strong> arise from scheduling: technicians&#8217; experience remains critical in setting standard times, but it is the tool that <strong>cross-references activities, loads, and dependencies<\/strong> to return the <strong>most realistic date<\/strong>, managing <strong>alternatives and urgencies<\/strong>.<\/p>\n\n<p>To enable this qualitative leap, we worked on key steps:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>Analysis of processes<\/strong> intended for scheduling and <strong>calculation of<\/strong> available <strong>capacity<\/strong>.<br\/><\/li>\n\n\n\n<li><strong>Distinction<\/strong> between scheduled and non-scheduled processes (activities that commit resources but do not directly contribute to mold making), so as to avoid &#8220;noise&#8221; in the plan.<br\/><\/li>\n\n\n\n<li><strong>New hour record keeping<\/strong>, with clear &#8220;containers&#8221; to reduce errors and facilitate timekeeping; <strong>staff training<\/strong> on procedures and tools.<\/li>\n<\/ul>\n\n<h2 class=\"wp-block-heading\"><strong>The results: punctuality, simplicity, visibility<\/strong><\/h2>\n\n<p>Adoption of the new model has generated <strong>concrete and measurable<\/strong> benefits:<\/p>\n\n<p><strong>Sharply increasing punctuality.<\/strong> The <strong>rate of meeting delivery dates<\/strong> increased <strong>from ~50% to ~90%<\/strong> in about two years. The parallel introduction of structured <strong>project management<\/strong> practices also contributed to this result. <\/p>\n\n<p><strong>Operational simplification.<\/strong> <strong>Time recording<\/strong> for staff has been <strong>streamlined<\/strong> (with reduction\/elimination of errors typical of the previous system), and <strong>automatic<\/strong> time <strong>tracking<\/strong> for <strong>work centers<\/strong> ensures <strong>consistent and timely<\/strong> data.<\/p>\n\n<p><strong>More reliable forecasts.<\/strong> We can run delivery <strong>simulations<\/strong> based on <strong>historical data for the past three years<\/strong>, segmenting by <strong>product family<\/strong> and <strong>mold type<\/strong>. Multi-job planning becomes more robust and improves <strong>critical resource<\/strong> allocation. <\/p>\n\n<h2 class=\"wp-block-heading\"><strong>Why it all matters to our clients<\/strong><\/h2>\n\n<ul class=\"wp-block-list\">\n<li><strong>Delivery date as a commitment, not an estimate.<\/strong> Finite-capacity planning turns a promise into an <strong>executable plan<\/strong>, with <strong>objective checkpoints<\/strong>.<\/li>\n\n\n\n<li><strong>Resource optimization.<\/strong> The right people, the right machines, <strong>at the right time<\/strong>: less downtime, fewer bottlenecks, <strong>lower risk of delay<\/strong>.<\/li>\n\n\n\n<li><strong>Responsiveness to change.<\/strong> Urgencies, priorities, unforeseen events: integrated scheduling enables <strong>rapid rescheduling<\/strong> without losing sight of the whole.<\/li>\n<\/ul>\n\n<h2 class=\"wp-block-heading\"><strong>A look beyond: data, method, continuous improvement<\/strong><\/h2>\n\n<p>Planning is one piece of our <strong>integrated approach-from<\/strong><strong>listening<\/strong> and <strong>co-design<\/strong> to <strong>mold making<\/strong> and mass <strong>molding-with<\/strong> a <strong>data-driven<\/strong> approach and <strong>continuous improvement<\/strong>. We turn <strong>complexity into visibility<\/strong>, and <strong>visibility into reliability<\/strong>. <\/p>\n\n<p>If you want to learn more about how we set up plans and resources on your project, let&#8217;s start with <strong>shared feasibility-that<\/strong>&#8216;s where dates become results.<\/p>\n\n<p><strong>Meccanostampi. Where ideas take shape. <\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>At Meccanostampi, scheduling is not an ancillary activity: it is the engine that aligns people, equipment and priorities to meet the delivery date required by the customer. That is why we have structured the scheduling of our two BUs, &#8220;Moldmaking &#8221; and &#8220;Molding,&#8221; in an integrated way. Today we operate with a multi-project management platform [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3233,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[],"class_list":["post-3211","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-press-en-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>From floor to press: multi-project management that keeps its promises<\/title>\n<meta name=\"description\" content=\"We operate with a multi-project management platform for tooling (design, construction, mold testing and inspection)\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"From floor to press: multi-project management that keeps its promises\" \/>\n<meta property=\"og:description\" content=\"We operate with a multi-project management platform for tooling (design, construction, mold testing and inspection)\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/\" \/>\n<meta property=\"og:site_name\" content=\"Meccanostampi\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-16T09:38:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-21T11:02:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.meccanostampi.it\/wp-content\/uploads\/2025\/10\/IMG_3806-scaled.png\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1572\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin_meccanostampi\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin_meccanostampi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.meccanostampi.it\\\/en\\\/from-floor-to-press-multi-project-management-that-keeps-its-promises\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.meccanostampi.it\\\/en\\\/from-floor-to-press-multi-project-management-that-keeps-its-promises\\\/\"},\"author\":{\"name\":\"admin_meccanostampi\",\"@id\":\"https:\\\/\\\/www.meccanostampi.it\\\/#\\\/schema\\\/person\\\/3d336ae5946f4c4bd5c98a11c9cd2c06\"},\"headline\":\"From floor to press: multi-project management that keeps its promises\",\"datePublished\":\"2025-10-16T09:38:08+00:00\",\"dateModified\":\"2025-10-21T11:02:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.meccanostampi.it\\\/en\\\/from-floor-to-press-multi-project-management-that-keeps-its-promises\\\/\"},\"wordCount\":645,\"image\":{\"@id\":\"https:\\\/\\\/www.meccanostampi.it\\\/en\\\/from-floor-to-press-multi-project-management-that-keeps-its-promises\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.meccanostampi.it\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/IMG_3806-scaled.png\",\"articleSection\":[\"Press\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.meccanostampi.it\\\/en\\\/from-floor-to-press-multi-project-management-that-keeps-its-promises\\\/\",\"url\":\"https:\\\/\\\/www.meccanostampi.it\\\/en\\\/from-floor-to-press-multi-project-management-that-keeps-its-promises\\\/\",\"name\":\"From floor to press: multi-project management that keeps its promises\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.meccanostampi.it\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.meccanostampi.it\\\/en\\\/from-floor-to-press-multi-project-management-that-keeps-its-promises\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.meccanostampi.it\\\/en\\\/from-floor-to-press-multi-project-management-that-keeps-its-promises\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.meccanostampi.it\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/IMG_3806-scaled.png\",\"datePublished\":\"2025-10-16T09:38:08+00:00\",\"dateModified\":\"2025-10-21T11:02:43+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.meccanostampi.it\\\/#\\\/schema\\\/person\\\/3d336ae5946f4c4bd5c98a11c9cd2c06\"},\"description\":\"We operate with a multi-project management platform for tooling (design, construction, mold testing and inspection)\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.meccanostampi.it\\\/en\\\/from-floor-to-press-multi-project-management-that-keeps-its-promises\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.meccanostampi.it\\\/en\\\/from-floor-to-press-multi-project-management-that-keeps-its-promises\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.meccanostampi.it\\\/en\\\/from-floor-to-press-multi-project-management-that-keeps-its-promises\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.meccanostampi.it\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/IMG_3806-scaled.png\",\"contentUrl\":\"https:\\\/\\\/www.meccanostampi.it\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/IMG_3806-scaled.png\",\"width\":2560,\"height\":1572},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.meccanostampi.it\\\/en\\\/from-floor-to-press-multi-project-management-that-keeps-its-promises\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.meccanostampi.it\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"From floor to press: multi-project management that keeps its promises\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.meccanostampi.it\\\/#website\",\"url\":\"https:\\\/\\\/www.meccanostampi.it\\\/\",\"name\":\"Meccanostampi\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.meccanostampi.it\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.meccanostampi.it\\\/#\\\/schema\\\/person\\\/3d336ae5946f4c4bd5c98a11c9cd2c06\",\"name\":\"admin_meccanostampi\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/14f3ed54afc960ebc77550569bee0ed7847cce88383f18b824287049df8ef1f5?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/14f3ed54afc960ebc77550569bee0ed7847cce88383f18b824287049df8ef1f5?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/14f3ed54afc960ebc77550569bee0ed7847cce88383f18b824287049df8ef1f5?s=96&d=mm&r=g\",\"caption\":\"admin_meccanostampi\"},\"sameAs\":[\"http:\\\/\\\/meccanostampi.it\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"From floor to press: multi-project management that keeps its promises","description":"We operate with a multi-project management platform for tooling (design, construction, mold testing and inspection)","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/","og_locale":"en_US","og_type":"article","og_title":"From floor to press: multi-project management that keeps its promises","og_description":"We operate with a multi-project management platform for tooling (design, construction, mold testing and inspection)","og_url":"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/","og_site_name":"Meccanostampi","article_published_time":"2025-10-16T09:38:08+00:00","article_modified_time":"2025-10-21T11:02:43+00:00","og_image":[{"width":2560,"height":1572,"url":"https:\/\/www.meccanostampi.it\/wp-content\/uploads\/2025\/10\/IMG_3806-scaled.png","type":"image\/png"}],"author":"admin_meccanostampi","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin_meccanostampi","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/#article","isPartOf":{"@id":"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/"},"author":{"name":"admin_meccanostampi","@id":"https:\/\/www.meccanostampi.it\/#\/schema\/person\/3d336ae5946f4c4bd5c98a11c9cd2c06"},"headline":"From floor to press: multi-project management that keeps its promises","datePublished":"2025-10-16T09:38:08+00:00","dateModified":"2025-10-21T11:02:43+00:00","mainEntityOfPage":{"@id":"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/"},"wordCount":645,"image":{"@id":"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/#primaryimage"},"thumbnailUrl":"https:\/\/www.meccanostampi.it\/wp-content\/uploads\/2025\/10\/IMG_3806-scaled.png","articleSection":["Press"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/","url":"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/","name":"From floor to press: multi-project management that keeps its promises","isPartOf":{"@id":"https:\/\/www.meccanostampi.it\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/#primaryimage"},"image":{"@id":"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/#primaryimage"},"thumbnailUrl":"https:\/\/www.meccanostampi.it\/wp-content\/uploads\/2025\/10\/IMG_3806-scaled.png","datePublished":"2025-10-16T09:38:08+00:00","dateModified":"2025-10-21T11:02:43+00:00","author":{"@id":"https:\/\/www.meccanostampi.it\/#\/schema\/person\/3d336ae5946f4c4bd5c98a11c9cd2c06"},"description":"We operate with a multi-project management platform for tooling (design, construction, mold testing and inspection)","breadcrumb":{"@id":"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/#primaryimage","url":"https:\/\/www.meccanostampi.it\/wp-content\/uploads\/2025\/10\/IMG_3806-scaled.png","contentUrl":"https:\/\/www.meccanostampi.it\/wp-content\/uploads\/2025\/10\/IMG_3806-scaled.png","width":2560,"height":1572},{"@type":"BreadcrumbList","@id":"https:\/\/www.meccanostampi.it\/en\/from-floor-to-press-multi-project-management-that-keeps-its-promises\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.meccanostampi.it\/"},{"@type":"ListItem","position":2,"name":"From floor to press: multi-project management that keeps its promises"}]},{"@type":"WebSite","@id":"https:\/\/www.meccanostampi.it\/#website","url":"https:\/\/www.meccanostampi.it\/","name":"Meccanostampi","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.meccanostampi.it\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.meccanostampi.it\/#\/schema\/person\/3d336ae5946f4c4bd5c98a11c9cd2c06","name":"admin_meccanostampi","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/14f3ed54afc960ebc77550569bee0ed7847cce88383f18b824287049df8ef1f5?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/14f3ed54afc960ebc77550569bee0ed7847cce88383f18b824287049df8ef1f5?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/14f3ed54afc960ebc77550569bee0ed7847cce88383f18b824287049df8ef1f5?s=96&d=mm&r=g","caption":"admin_meccanostampi"},"sameAs":["http:\/\/meccanostampi.it"]}]}},"_links":{"self":[{"href":"https:\/\/www.meccanostampi.it\/en\/wp-json\/wp\/v2\/posts\/3211","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.meccanostampi.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.meccanostampi.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.meccanostampi.it\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.meccanostampi.it\/en\/wp-json\/wp\/v2\/comments?post=3211"}],"version-history":[{"count":3,"href":"https:\/\/www.meccanostampi.it\/en\/wp-json\/wp\/v2\/posts\/3211\/revisions"}],"predecessor-version":[{"id":3214,"href":"https:\/\/www.meccanostampi.it\/en\/wp-json\/wp\/v2\/posts\/3211\/revisions\/3214"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.meccanostampi.it\/en\/wp-json\/wp\/v2\/media\/3233"}],"wp:attachment":[{"href":"https:\/\/www.meccanostampi.it\/en\/wp-json\/wp\/v2\/media?parent=3211"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.meccanostampi.it\/en\/wp-json\/wp\/v2\/categories?post=3211"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.meccanostampi.it\/en\/wp-json\/wp\/v2\/tags?post=3211"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}